Tile To Tile Installation Guide
Tile To Tile Installation Guide
The Tile to Tile runs between two walls with tiles on either side of the drain. This drain is designed to have a stylish appearance to suit any bathroom decor. Please download the full PDF for print for your convenience here.
Step 1.

Mark out floor area to suit drain size.
Step 2.

Remove floor area to gain access to floor joists, add additional floor joist support if necessary.
Step 3.

Cut and fix graded batons over existing floor joists.
Step 4.

After fall has been created, refit existing flooring, leaving room for new drain at the front.
Step 5.

Check that the drain fits prior to installing ceramic tile underlay.
Step 6.

After installing ceramic tile underlay, recheck the drain fit. Place F-flashing in required position and mark area of drain and F-flashing
Step 7.

Install drain using sealant and stainless steel screws provided.
Step 8.

Install F-flashing using sealant and 20mm stainless steel clouts or similar
Step 9.

Your bathroom is now ready for final waterproofing and tiling.
- Categories:
- Bathroom /
- Indoor /
- Tile to Tile
-
Tile To Tile Installation Guide
-
Absolute Installation Guide
-
Wide Waterproofing Flanges
-
Square Overgrate and Poly Pit
-
Gallery
-
Contact Us
-
Built In Fall
-
Ultimate Product List
-
Advantage Corner Drain
-
Light Vehicle Grate
-
Advantage Tile to Tile with Glass Insert
-
Approved to Australian Standards
-
Accessories Product List
-
Installation Gallery
-
Overgrate Product Page
-
Recessed Soap Box
-
About Us
-
Tile Insert Wall to Tile
-
Indoor Product List
-
Zero Threshold Type
-
Arrow Slot Drain Install Guide
-
Custom Lengths
